Spectrophotometer

Reference Designator
CE07SHSM-RID27-01-OPTAAD000
Start Depth
7
End Depth
7
Location
Near Surface Instrument Frame
Current Status
Operational
Class
OPTAA (Absorption Spectrophotometer)
Series
OPTAA-D
Science Discipline
Biological
Make
WET Labs
Model
AC-S
M2M Example
https://ooinet.oceanobservatories.org/api/m2m/12576/sensor/inv/CE07SHSM/RID27/01-OPTAAD000/metadata
Method Data Stream Content Type
recovered_host optaa_dj_dcl_instrument_recovered Data Products Report M2M Stats Science
recovered_host optaa_dj_dcl_metadata_recovered Metadata Report M2M Engineering
telemetered optaa_dj_dcl_instrument Data Products Report M2M Stats Science
telemetered optaa_dj_dcl_metadata Metadata Report M2M Engineering
Deployment Cruise Start Date Stop Date Mooring Asset Node Asset Sensor Asset Latitude Longitude Deployment Depth Water Depth
1 OC1503D 04/15/2015 09/23/2015 CGMCE-07SHSM-00001 CGINS-OPTAAD-00124 46.9861 -124.566 7 87
2 OC1510A 10/13/2015 05/13/2016 CGMCE-07SHSM-00002 CGINS-OPTAAD-00260 46.9875 -124.569 7 90
3 TN-342 05/05/2016 09/27/2016 CGMCE-07SHSM-00003 CGINS-OPTAAD-00171 46.9895 -124.569 7 87
4 AT37-03 09/20/2016 04/13/2017 CGMCE-07SHSM-00004 CGINS-OPTAAD-00208 46.9859 -124.566 87
5 SKQ201704S 04/11/2017 10/06/2017 CGMCE-07SHSM-00005 CGINS-OPTAAD-00182 46.9882 -124.567 89
6 SKQ201715S 10/03/2017 03/29/2018 CGMCE-07SHSM-00006 CGINS-OPTAAD-00171 46.9852 -124.564 7 87
7 SKQ201808S 03/25/2018 CGMCE-07SHSM-00007 CGINS-OPTAAD-00208 46.9881 -124.568 7 87
Metadata Start Date End Date Comment
CE07SHSM-RID27-01-OPTAAD000
Deployment: 6
Asset: CGINS-OPTAAD-00171
Status: Failed
10/24/17 4/2/18

CE07SHSM NSIF OPTAA stopped working

Deployed Oct-3. Oct-24 it was observed to no longer be delivering full 3 minute bursts of data to its DCL. It got progressively worse, so on Nov-2 it was turned off.

By Mike Smith, on 12/6/17
Redmine Issue #12964

CE07SHSM
Deployment: 6
Asset: CGMCE-07SHSM-00006
Status: Open Issue
11/2/17 4/2/18

CE07SHSM no longer able to recharge batteries (PSC)

The mooring stopped receiving power from photo voltaic panel #1 of 4 on Nov-2. By Nov-20, the mooring stopped receiving power from two more solar panels (PV2 & PV4) and one of two wind turbines (WT2). This indicates the Power System Controller (PSC) they connect to is failing. Mooring components will be shut down as the mooring loses the ability to recharge its batteries.

By Mike Smith, on 12/6/17
Redmine Issue #12965

New Note

Metadata Start Date End Date Comment
CE07SHSM
12/15/17, 9:05 AM 12/15/17, 9:05 AM

CE07SHSM no longer able to recharge batteries (PSC)

The mooring stopped receiving power from photo voltaic panel #1 of 4 on Nov-2. By Nov-20, the mooring stopped receiving power from two more solar panels (PV2 & PV4) and one of two wind turbines (WT2). This indicates the Power System Controller (PSC) they connect to is failing. Mooring components will be shut down as the mooring loses the ability to recharge its batteries.

Id: 1237 By: michaesm
Flag: not_operational Exclude: No