Dissolved Oxygen

Reference Designator
GS01SUMO-SBD11-04-DOSTAD000
Start Depth
1
End Depth
1
Location
Bottom of Buoy
Current Status
Operational
Class
DOSTA (Dissolved Oxygen Stable Response)
Series
DOSTA-D
Science Discipline
Chemical
Make
Aanderaa
Model
Optode 4831
M2M Example
https://ooinet.oceanobservatories.org/api/m2m/12576/sensor/inv/GS01SUMO/SBD11/04-DOSTAD000/metadata
Method Data Stream Content Type
recovered_host dosta_abcdjm_dcl_instrument_recovered Data Products Report M2M Stats Science
telemetered dosta_abcdjm_dcl_instrument Data Products Report M2M Stats Science
Deployment Cruise Start Date Stop Date Mooring Asset Node Asset Sensor Asset Latitude Longitude Deployment Depth Water Depth
1 Review AT-26-29 02/18/2015 12/27/2015 CGMGS-01SUMO-00001 CGINS-DOSTAD-00379 -54.4083 -89.3575 1 4611
2 Review NBP-15-11 12/14/2015 12/12/2016 CGMGS-01SUMO-00002 CGINS-DOSTAD-00495 -54.4041 -89.2069 1 4588
3 Review NBP16-10 11/25/2016 CGMGS-01SUMO-00003 CGINS-DOSTAD-00410 -54.4076 -89.3567 1 4612
Metadata Start Date End Date Comment
GS01SUMO
Deployment: 2

WHOI is reporting that ADCP data should be sampling every hour and sometimes every 3 hours such as on Deployment 3.

There were few gaps in ADCP data that were confirmed by WHOI for
/gs01sumo/D0002/cg_data/dcl11/imm/adcp :

28-Jun-2016 to 5-Jul-2016 and later in July.

(this note is taken from an email exchange with Sheri White ... last email was 2-Feb-2017)

By Leila Belabbassi, on 2/20/17

New Note

Metadata Start Date End Date Comment
GS01SUMO-SBD11
12/13/15, 7:00 PM 12/11/16, 7:00 PM

Upon recovery of deployment 2, damage to some components of the surface buoy were noted (e.g., FDCHP was bent, the tops of the METBK-PRC and FleetBroadBand antenna were missing).

Id: 94 By: lgarzio

GS01SUMO-SBD11-04-DOSTAD000
3/11/16, 7:00 PM 12/12/16, 2:58 AM

Deployment 2: Dissolved oxygen noise increased, possibly from biofouling.

Id: 780 By: lgarzio
Flag: suspect Exclude: No

GS01SUMO-SBD11-04-DOSTAD000
1/27/17, 7:00 PM

Deployment 3: Dissolved oxygen noise increased, possibly from biofouling.

Id: 781 By: lgarzio
Flag: suspect Exclude: No

GS01SUMO
12/8/17, 7:00 PM

Deployment 3: Recovery of the mooring was planned during the NBP 17-09 cruise (Nov - Dec 2017) but not completed due to adverse weather conditions. Recovery options are pending. Instruments that are still operational are likely reaching (or have surpassed) their deployment lifespan.

Id: 834 By: lgarzio