Notes

Sort by:
  • Reference Designator
  • First Name
  • Created
  • Modified  
  • Metadata Start Date End Date Comment
    GI01SUMO
    Deployment: 1
    4/13/15 4/13/15 Deployment 1 - All communications with the buoy lost on 04/13/2015. One XEOS Melo beacon continued to provide location information through recovery.

    By Lori Garzio, on 7/21/16

    GI01SUMO
    Deployment: 1
    9/26/14 9/26/14 Deployment 1 - Iridium ISU communications lost on 09/26/2014.

    By Lori Garzio, on 7/21/16

    GI01SUMO
    Deployment: 1
    9/15/14 9/15/14 Deployment 1 - deployed on 09/10/2014 and was fully functional. On 09/15/2014 all Fleet Broadband telemetry was lost

    By Lori Garzio, on 7/21/16

    GI05MOAS-GL477
    Deployment: 1
    4/17/15 4/17/15 Deployment 1 - glider lost at sea

    By Lori Garzio, on 7/21/16

    GA01SUMO-SBD12-06-METBKA000
    Deployment: 2
    11/14/15 11/1/16 Deployment 2 - precipitation sensors are reporting invalid data

    By Lori Garzio, on 7/21/16

    GA01SUMO-SBD11-06-METBKA000
    Deployment: 2
    11/14/15 11/1/16 Deployment 2 - precipitation sensors are reporting invalid data

    By Lori Garzio, on 7/21/16

    GA01SUMO-RII11-02-PHSENE041
    Deployment: 2
    11/17/15 11/1/16 Deployment 2 - The inductive modem connected to this instrument stopped responding to requests for data after 11/17/2015 22:06 UTC, data status unknown.

    By Lori Garzio, on 7/21/16

    GA05MOAS-GL496
    Deployment: 1
    12/15/15 3/16/16 Deployment 1 - glider fouled and went adrift, last science data received on 12/15/2015, last message from glider received on 3/16/2016.

    By Lori Garzio, on 7/20/16

    CP05MOAS-GL380
    Deployment: 2
    10/15/15 10/15/15 Deployment 2 - glider recovered on 10/15/2015 missing a wing.

    By Lori Garzio, on 7/20/16

    CP05MOAS-GL389
    Deployment: 1
    1/11/15 1/11/15 Deployment 1 - deployed on 1/11/2015, recovered for ballast correction and was re-deployed on the same day.

    By Lori Garzio, on 7/20/16

    CP05MOAS-GL340
    Deployment: 1
    12/12/14 12/12/14 Deployment 1 - glider recovered on 12/12/2014 with a damaged wing and missing rudder.

    By Lori Garzio, on 7/20/16

    CP05MOAS-GL335
    Deployment: 1
    12/13/14 12/13/14 Deployment 1 - glider recovered on 12/13/2014 with a damaged wing.

    By Lori Garzio, on 7/20/16

    CP05MOAS-GL335
    Deployment: 1
    10/6/14 10/6/14 Deployment 1 - deployed on 10/6/2014 at 15:08 UTC, recovered for ballast correction and was re-deployed at 20:16 UTC.

    By Lori Garzio, on 7/20/16

    GA05MOAS-GL493
    Deployment: 1
    11/13/15 11/13/15 Deployment 1 - glider was experiencing rudder problems and upon recovery on 11/13/2015 was found to be bio-fouled along seams and around tail fin.

    By Lori Garzio, on 7/20/16

    GI05MOAS-GL495
    Deployment: 2
    11/5/15 11/5/15 Deployment 2 - deployed on 08/17/2015 and lost communications on 11/05/2015 prior to a period of very stormy weather. Glider lost at sea.

    By Lori Garzio, on 7/5/16
    Redmine Issue #9408

    GI05MOAS-GL485
    Deployment: 2
    11/12/15 11/20/15 Deployment 2 - glider went adrift on 11/12/2015 after a forward compartment leak, lost at sea on 11/20/2015.

    By Lori Garzio, on 7/6/16
    Redmine Issue #9407

    CP01CNSM-SBD12-08-FDCHPA000
    Deployment: 4
    10/23/15 5/13/16 Anemometer broken during deployment (D00004). Replaced on D00005

    By Lori Garzio, on 7/6/16
    Redmine Issue #9411

    CP02PMUI-WFP01
    Deployment: 6
    3/1/16 5/21/16 Wire Following Profiler profiling erratically - sometimes unable to reach the programmed top depth

    By Lori Garzio, on 7/6/16
    Redmine Issue #9888

    CP02PMUO-WFP01
    Deployment: 6
    10/15/15 5/18/16 Wire Following Profiler failed on 10/15/2015. Replaced on 05/18/2016.

    By Lori Garzio, on 7/6/16
    Redmine Issue #10303

    CP04OSPM-WFP01
    Deployment: 5
    6/2/16 6/2/16 Wire Following Profiler is stuck at the top of its range.

    By Lori Garzio, on 7/6/16
    Redmine Issue #10410

    7 of 11